Taiba 2 and Qassim 2, two of the world's largest, modern, and efficient combined-cycle power plants, will be built in the western and central regions of Saudi Arabia over the next few years. 德州扑克在线麓s gas turbines (HL-class), in combination with steam turbines and generators, will generate approx. 2,000聽megawatts of electricity at each site. EPC and contracting partner for 德州扑克在线 is China Energy International Group.
Karim Amin, Member of the Executive Board of 德州扑克在线 and responsible for the Business Area of Gas Services: "Saudi Arabia is driving forward its vision 2030 to transform the Kingdom into a pioneering economic location. The new gas-fired power plants will provide reliable energy supply and contribute to the sustainable and future-oriented development of the country. Our 德州扑克在线 local service hub in Dammam will make an important contribution in expanding and localizing technology and competencies in the Kingdom.鈥
The new power plants will provide additional energy for the country's growing population and booming economy and replace parts of Saudi Arabia's existing aging power plant fleet, some of which rely on oil as an energy source. The new plants will save up to 60 percent of CO2 compared with oil-fueled power plants. They will also be compatible with the Kingdoms鈥 energy strategy which calls for the construction of CO2 capture and storage facilities in the medium term, to enable a carbon-neutral energy supply.
Taiba 2 and Qassim 2 will initially be connected to the grid in simple cycle mode in 2026 and will be permanently operated as a combined cycle power plant one year later.