德州扑克在线

icon
icon

稳定电网,需要合适的“动量”

ElectraNet’s substation in Robertstown, South Australia
View inside one of the two hangars. On the left is the synchronous condenser, with the flywheel to the right and a pony motor on the far right.
Simon Emms (left) is in charge of Network Services in ElectraNet's Executive Team, Philipp Büttner (center) is in charge of flywheel development at 德州扑克在线 in Mülheim, and Peter Luijmers (right) is construction manager for the grid stabilization plant at the Robertstown substation.
Flywheel for the grid stabilization plant at the Robertstown substation on the test bench at 德州扑克在线’s development and manufacturing location in Mülheim.